Vehicle History

LCAC Hovercraft: Specs, History and the LCAC 100 Class

By AAAV Published

The Landing Craft, Air Cushion (LCAC) is the US Navy’s fully amphibious hovercraft for moving Marine Corps vehicles, cargo and personnel from well-deck ships to the beach and beyond. The legacy LCAC carries a 60-ton payload (75 tons in overload), reaches more than 40 knots at full load and is operated by a crew of five, according to the Navy’s LCAC fact file. All 91 craft of the original class were delivered between 1984 and 2001. Their replacement, the Ship-to-Shore Connector (SSC), is also designated LCAC and numbered from LCAC 100 upward. As of November 2026, 19 have been delivered: the latest, LCAC 118, was accepted by the Navy on 28 October 2026, and LCAC 119 through 131 are under construction, according to the Navy’s delivery release.

The physics of lift fans and flexible skirts is explained in the site’s guide to how hovercraft work.

Quick facts

ItemLegacy LCAC (LCAC 1 to 91)Ship-to-Shore Connector (LCAC 100 class)
BuilderTextron Marine and Land Systems (New Orleans) and Avondale Gulfport MarineTextron Systems (New Orleans)
Delivered1984 to 2001; 91 builtFrom February 2020; 19 delivered (LCAC 100 to 118) as of November 2026
Program of record72 operational craft plus 1 R&D craft73 craft (1 test and training plus 72 operational)
Payload60 tons; 75 tons overload74 short tons
Speed40+ knots with full load35+ knots (Navy); 35 knots in Sea State 3 (Textron)
Range200 miles at 35 knots with a 50-ton payloadMission radius of at least 25 nautical miles (Navy fact file, 2020)
Length and beam91 ft 9.5 in by 48 ft 4 in91.80 ft by 48.25 ft (with skirt)
CrewFiveFive (Navy fact file); four operators (Textron, 2026)
PropulsionFour gas turbines, two for lift and two for propulsion, 16,000 hp sustainedFour gas turbine engines
Armament mountsM2HB .50 cal, M240 7.62 mm, Mk 19 40 mmNot listed in the fact file

The legacy figures come from the Navy’s LCAC fact file (last updated October 2021) and match the NAVSEA LCAC SLEP fact sheet (updated January 2019). The SSC figures come from the Navy’s Ship-to-Shore Connector fact file (last updated August 2020), a Baird Maritime report on Textron’s October 2026 announcement and the Navy’s LCAC 118 delivery release. Where the Navy and Textron differ, as on SSC crew size, both figures are shown.

What the LCAC is and what it carries

The Navy describes the LCAC as a high-speed, over-the-beach, fully amphibious landing craft that moves the weapons systems, equipment, cargo and personnel of the Marine Air-Ground Task Force from ship to shore and across the beach. The fact file says it can carry heavy payloads such as an M-1 tank at high speed. A December 2011 Defense Media Network article qualifies that: the craft’s normal carrying capacity of 60 tons “does not support the M1A1 tank”, although it can haul 75 tons in limited overload conditions. The same article gives the craft’s size as 88 by 47 feet at rest, growing to 92 by 48 feet when the skirt is inflated, consistent with the fact file’s 91 ft 9.5 in by 48 ft 4 in.

Beyond landing vehicles, the fact file lists personnel transport, evacuation support, lane breaching, mine countermeasure operations, and delivery of Marine and Special Warfare equipment. Defense Media Network adds an enclosed personnel module that carries 145 combat-equipped Marines or 108 casualty litters.

The Navy’s main argument for the type is access. Air cushion technology lets the craft reach more than 70 percent of the world’s coastline, while only about 15 percent is accessible to conventional landing craft.

Development: from JEFF prototypes to production

The Navy fact file traces the concept to the early 1970s and the full-scale Amphibious Assault Landing Craft (AALC) test vehicle. Two prototypes followed:

  • JEFF A, designed and built by Aerojet General in California.
  • JEFF B, designed and built by Bell Aerospace in New Orleans.

Both confirmed the technical feasibility of the concept, and JEFF B was selected as the design basis for the production LCAC. Defense Media Network dates the prototype testing to 1977 through 1981.

The first LCAC was delivered to the Navy in 1984. Initial operational capability came in 1986 and full production was approved in 1987. Two companies, Textron Marine and Land Systems of New Orleans and Avondale Gulfport Marine, each received an initial 15-craft production contract, after which Textron was selected to build the remaining craft. The 91st and final craft was delivered in 2001. LCAC first deployed in 1987 aboard USS Germantown (LSD 42). Textron also built six craft for Japan, per Defense Media Network.

How the LCAC operates from well-deck ships

The Navy fact file says the LCAC is carried in and operates from all amphibious well-deck ships: the LHA, LHD, LSD, LPD and ESD classes. Because every craft has to fit those well decks, the replacement was built to the same footprint, as described below.

The operating cycle follows a pattern:

  1. Loaded in the ship’s well deck, the LCAC rises on its air cushion and exits the well deck at the stern.
  2. It crosses the water at speed. The fact file’s range figure of 200 miles at 35 knots assumes a 50-ton payload.
  3. It rides up onto the beach and across it to unload, which conventional landing craft cannot do.
  4. It returns to the ship, drives back into the well deck and is loaded again.

Propulsion on the legacy craft is two shrouded, reversible-pitch airscrews driven by gas turbines, with four double-entry fans providing lift. The Navy’s SSC fact file says the replacement keeps similar configuration, dimensions and clearances so that it fits existing well decks, and lists the LPD 17, LSD 41, LSD 49, LHA 1 and LHD 1 classes and the Expeditionary Transfer Dock as host ships.

Service Life Extension Program (SLEP)

To keep the fleet in service until a replacement arrived, the Navy launched a Service Life Extension Program that adds 10 years to the craft’s design life. The fact file says the program is based on LCAC 91, the last craft built, and that the program of record is 72 operational craft and one R&D craft. A Defense News report dates the start of the extension to 2000.

Progress, as the Navy recorded it:

  • 64 LCACs had undergone SLEP as of 1 December 2018, with three more under contract (and an option for a fourth) through fiscal year 2021.
  • The fact file projected 68 LCACs would have been through SLEP when the program concluded in 2021.
  • SLEP replaced the four Allied-Signal TF-40 turbines with four Vericor ETF-40B gas turbines with Full Authority Digital Engine Control, per the NAVSEA SLEP fact sheet.

The Navy’s later reasoning for a new craft, as Defense Media Network reports it, was that the growing weight of expeditionary equipment exceeded what the SLEP craft could support, and that technology had advanced enough to improve availability, performance and reliability.

Ship-to-Shore Connector: the LCAC 100 class

The SSC is the “evolutionary replacement” for the LCAC. According to the Navy’s fact file it was the first major naval acquisition program in more than 15 years designed in-house by the Navy rather than by private industry. The detail design and construction contract went to Textron Systems, which the SSC fact file locates in Slidell, Louisiana; the LCAC fact file dates the award to 6 July 2012. The craft are built and delivered in New Orleans.

What changed from the legacy craft

The SSC is nearly the same size, but its payload rating rises to 74 short tons against 60 tons. Army Recognition’s report on Textron’s October 2026 announcement lists four gas-turbine engines, a speed of 35 knots in Sea State 3, a four-person crew (pilot, co-pilot, loadmaster and deck engineer), a planned 30-year service life and an enclosed troop module for up to 145 combat-equipped personnel. Baird Maritime gives the cargo deck as 67 by 24 feet.

Program timeline

DateMilestoneSource
1984First production LCAC deliveredNavy fact file
1986LCAC initial operational capabilityNavy fact file
1987Full production approved; first deployment aboard USS GermantownNavy fact file
2001LCAC 91, the final legacy craft, deliveredNavy fact file
6 July 2012Textron awarded SSC detail design and construction contractNavy fact file
6 February 2020Navy accepts SSC Craft 100, the developmental unitNAVSEA release
16 April 2020Navy awards $386 million modification for 15 more craft (FY 2017 to 2020 procurement)NAVSEA release
28 June 2023LCAC 107 accepted in New OrleansExecutiveGov
June 2024Nine craft delivered; 24 of 72 on contract; GAO notes slipped IOCDefense News
April 2025Critical Nunn-McCurdy unit cost breach, the program’s second in five yearsGAO-26-108457
August 202515 of 73 planned craft deliveredGAO-26-108457
15 June 2026LCAC 116 accepted; LCAC 117 to 129 in productionPAE Maritime release
6 October 2026Textron announces $230 million modification for two more craft; 18 deliveredBaird Maritime
28 October 2026LCAC 118, the 19th craft, accepted; LCAC 119 to 131 under constructionPAE Maritime release

The LCAC 107 acceptance followed Board of Inspection and Survey trials, as ExecutiveGov reported. The April 2020 award is described in the NAVSEA announcement, which also states that Craft 100 would be based in Panama City, Florida for testing and crew training, and that the original detail design and construction contract had procured nine craft. Nine plus 15 makes the 24 craft on contract that Defense News reported in 2024.

Delivery status as of November 2026

GAO counted 15 delivered as of August 2025. The Navy accepted LCAC 116 on 15 June 2026; its release the next day said the craft would transition to Assault Craft Unit 4 for fleet integration, crew training and certification, with LCAC 117 through 129 under construction. Textron’s 6 October 2026 statement reported 18 delivered and 13 in testing or production. The Navy then accepted LCAC 118 on 28 October 2026, the fourth SSC delivered that calendar year, with LCAC 119 through 131 under construction. That brings deliveries to 19 against the 73-craft program of record; Baird Maritime also counts LCAC 118 as the 19th of the class. The program office told GAO in 2026 that the contractor delivers four craft per year.

Cost, schedule and operational capability

GAO has reported cost growth and repeated schedule slips on the SSC. Its 2026 assessment reports that total acquisition cost rose by more than $2 billion since the previous assessment, mainly from unit cost growth driven by labor, material and overhead. That growth caused a critical Nunn-McCurdy unit cost breach in April 2025, the program’s second breach in five years. Program officials told GAO that the 2012 estimate was based on the LCAC design and underestimated costs because the SSC differed from the LCAC more than expected. GAO says the program is developing new cost and schedule baselines while its requirements stay the same, and the program reported that it was reassessed and certified to continue in October 2025.

On capability, GAO’s 2025 assessment says initial operational capability, originally scheduled for August 2020, had been delayed in every annual assessment, by more than five years in total. The cause GAO described was reliability problems with power inverter units; a simplified Electrical Power Generation System was tested on LCAC 100 in November 2024 and installation on other craft began in January 2025. GAO’s 2026 report says the program further delayed initial operational capability until initial operational test and evaluation (IOT&E) is finished, which hinges on fully installing the new power generation system and completing 19 mission trials with deployment-representative craft. The program office’s position, recorded in GAO’s 2025 report, is that it partially achieved IOC in 2023 when six craft had been delivered to the fleet, and full IOC will follow IOT&E.

The 2024 GAO assessment, as covered by Defense News, also cited fixes for cracked propeller blades and premature gearbox wear, and a hull weld deficiency on LCAC 108 that let water into the hull during testing; the defects were corrected and the craft was delivered in November 2023. Defense News also reported that the Navy slowed procurement to two craft per year in fiscal years 2025 to 2028. The October 2026 modification added two more craft, with contract work reported to run through May 2032.

Documented operations

Defense Media Network credits LCACs with delivering equipment, food, water and medical supplies in relief efforts after floods in Bangladesh, Indonesia and Pakistan and the earthquake in Haiti. Documented cases include:

  • Operation Desert Storm, 1991. The craft’s first operational use in a combat environment came in 1991, when 11 LCACs deployed on amphibious ships to the Persian Gulf to support a possible amphibious assault into Kuwait, according to Defense Media Network.
  • Indonesia, January 2005. After the Indian Ocean tsunami, LCACs assigned to USS Bonhomme Richard delivered materials and supplies to Meulaboh, Sumatra, on 10 January, according to a Navy photo caption reproduced by The War Zone.
  • Hurricane Katrina, September 2005. A Navy photo caption in the same article shows vehicles and equipment of Amphibious Construction Battalion Two arriving at Biloxi, Mississippi, on 4 September, carried by LCAC from USS Iwo Jima.
  • Haiti, January 2010. After the 12 January earthquake, LCACs of Assault Craft Unit 4 left USS Bataan’s well deck and arrived on Haitian beaches on 22 January. According to the Navy NewsStand story released the next day, three LCACs made seven trips to bring ashore 24 vehicles for the 22nd Marine Expeditionary Unit: eight Light Armored Vehicles and 16 Humvees. An official DVIDS photo caption shows two ACU 4 craft landing on a beach in Haiti to deliver relief supplies.

The LCAC is one of several approaches to crossing water and beach. For comparison, see the tracked assault amphibious vehicle and the wheeled Amphibious Combat Vehicle, which swim from ship to shore rather than fly over it.

Sources